Space Industry Analysis
Sep 10, 2012
PARIS — French defense equipment agency DGA has ordered a pair of studies from private industry on developing a successor to the Syracuse 3 military communications satellite system, the results of which are expected to support defense program decisions as the administration of President Francois Hollande updates the country’s defense and security strategy in the coming months.
Sep 10, 2012
HOUSTON — NASA and SpaceX are working toward an Oct. 9-10 launch of the first Falcon 9/Dragon Commercial Re-Supply Services (CRS) cargo mission to the International Space Station, though the two would like to lift off several days earlier if the opportunity arises. NASA would like to start the mission as soon as Oct. 5 if the U.S. Air Force Eastern Range becomes available, to avoid any conflicts with the launching of Russia’s Soyuz 30 mission to the station on Oct. 15, says Mike Suffredini, NASA’s ISS program manager.
Sep 10, 2012
NEW DELHI — The 51-hr. countdown is underway for India’s latest Polar Satellite Launch Vehicle (PSLV-C21) mission, which will orbit two foreign satellites. The PSLV-C21 will be launched from the Satish Dhawan space center at Sriharikota in south India at 9:51 a.m. local time on Sept. 9, an official at the Indian Space Research Organization (ISRO) says. The countdown began Sept. 7. The launch will mark ISRO’s 100th mission into space.
Sep 10, 2012
CHILL TEST: Results of a cold-temperature hot-fire test have qualified a new fixed nozzle for ATK’s GEM-60 strap-on solid-fuel booster for the United Launch Alliance Delta IV, as ATK continues to upgrade the 12-year-old design. In a test Sept. 6 at the ATK facility in Promontory, Utah, the 53-ft.-long GEM-60 was chilled to a core temperature of 30F before the 90-sec. burn, which generated about 270,000 lb. of thrust. In addition to qualifying the new fixed nozzle for flight, the test results validated the low-temperature performance of the new nozzle insulation.
Sep 07, 2012
Click here to view the pdf
Sep 07, 2012
NASA’s Dawn probe broke free of the pull of gravity from the asteroid Vesta early Sept. 5 and re-entered orbit around the Sun as its low-thrust xenon-ion propulsion system moves it on to the dwarf planet Ceres. With the change in orbit, which came at 2:26 a.m. EDT, Dawn started a transit through the Asteroid Belt that will take it to Ceres early in 2015. The spacecraft entered orbit around Vesta — exceeded in mass within the main belt only by Ceres — in July 2011, and spent 13 months studying the giant asteroid.
Sep 07, 2012
Operators at NASA’s Jet Propulsion Laboratory are starting the second and final phase of instrument checkout Curiosity's robotic arm
Sep 06, 2012
NEW DELHI — India has no plans to undertake a manned mission to the Moon in the near future, according to a senior government official.