Eyal Nahum has been appointed chief accountant of the Commercial Aircraft Group. Jacob Vistanetzky has been named chief accountant of the Bedek Aviation Group. Doron Zakai has been appointed chief accountant of the Systems, Missiles and Space Group.
The U.S. Air Force has awarded Northrop Grumman Systems Corp. a $104.6 million time-and-material contract through December 2009 to equip NATO's Airborne Early Warning and Control fleet of NE-3A aircraft with Large Aircraft Infrared Countermeasures (LAIRCM).
The C-27J Spartan is set to begin its early user survey (EUS) for the U.S. Army/Air Force Joint Cargo Aircraft (JCA) program on Nov. 7. Testing is expected to take two weeks and be spread over three locations: Pope Air Force Base, N.C., Maxwell Air Force Base, Ala., and Ft. Rucker, Ala.
Space shuttle managers will head to the Michoud Assembly Facility in New Orleans on Nov. 13 to assess an interim redesign of the external tank's worrisome ice/frost ramps and decide whether or not it is an improvement over continuing to fly the ramps as-is. The ice/frost ramps -- buildups of insulating foam designed to prevent ice formation -- are the last major area of concern on the tank for debris release during launch. There are 34 ice/frost ramps on the tank, which is built at Michoud.
European defense spending is stuck in slow motion as many nations scramble to pay for operational costs and maintain professional armies, according to a report by Forecast International released Nov. 6.
EADS CASA will supply four C-295s to the Brazilian air force before year's end - double the number of deliveries originally planned in 2006, the company said Nov. 6. They will go to support Brazil's Amazon Protection System and for the Calha Norte Project, which provides airlift into remote areas of the Amazon.
FINANCING PACKAGE: Loral Space & Communications has requested that a $300 million equity financing package proposed by MHR Fund Management be scaled back or abandoned because of interest among certain shareholders in participating in refinancing plans. The MHR placement, announced last month, is intended to fund growth.
AIR FORCE L3 Communications Vertex Aerospace, Madison, Miss., is being awarded a $12,262,168 firm-fixed-price contract modification. This action is exercising option VII (FY07), Oct. 1, 2006 through Sept. 30, 2007, in support of C-12 contractor logistic support. At this time, total funds have been obligated. This work will be complete by September 2007. Headquarters Oklahoma City Air Logistics Center, Tinker Air Force Base, Okla., is the contracting activity (F34601-00-C-0111/P00299).
Doug Greenlaw has been appointed director of Raytheon Virtual Technology Corp. Michael P. Morgan will lead the multi-intelligence strategy for the Intelligence and Information Systems (IIS) business. Garnett Stowe has been named vice president, National Intelligence Programs, in the Business Development organization.
With interest in airborne electronic warfare (EW) growing, Boeing says it has the capacity to produce more than the 86 EA-18G Growlers being sought by the U.S. Navy, which has been bearing the brunt of the aerial EW work for the U.S. military. U.S. Air Force leaders have said the Navy has too few Growlers to handle all of the military's needs. Navy officials have said the Air Force EW plans fall short as well.
The Sea Fighter, the catamaran-hulled experimental craft serving as a concept test bed for the Littoral Combat Ship (LCS) and other futuristic Navy ideas, will become an operationally deployable asset - but first the U.S. Navy apparently has to repair some major damage, according to the fiscal 2007 defense authorization act.
Sikorsky Aircraft Corp., part of United Technologies Corp., announced Nov. 3 that it has signed an agreement to provide Turkey with 17 new S-70B Seahawk helicopters. First deliveries are scheduled to begin in 2009. The contract is for Lot 2, which adds to seven S-70Bs already in the Turkish navy.
AIR FORCE Symetrics Industries, Melbourne, Fla., is being awarded a $67,352,765 firm-fixed-price contract. This action provides for production of ALE-47 countermeasures dispensing system Line Replacement Units (LRUs) and shop replaceable units managed by Combat Electronic Systems Directorate at Robins Air Force Base, Ga. At this time, no funds have been obligated. Headquarters Warner Robins Air Logistics Center, Robins Air Force Base, Ga., is the contracting activity (FA8540-06-D-0002).