Aerospace Daily & Defense Report

Staff
The Northrop Grumman-built amphibious transport dock ship Mesa Verde (LPD 19) successfully completed builder's trials in mid-August, the company and the U.S. Navy announced Aug. 20. "We had a very successful trial," said Philip Teel, corporate vice president and president of Northrop Grumman Ship Systems sector. "The ship is in great shape, and this team performed incredibly well. This ship is ready to serve the Navy."

Bettina Haymann Chavanne
The results from the Defense Advanced Research Projects Agency's (DARPA) year-long, 10-flight Autonomous Aerial Refueling Demonstration (AARD) were so successful that "four or five offices" in the military services were interested in a "fairly specific" follow-on activity, the Air Force program manager told Aerospace Daily.

Michael Bruno
Some U.S. military vehicle and equipment makers with goods destined for Iraqi forces are apparently having production issues, according to Senate Armed Services Committee (SASC) Chairman Carl Levin (D-Mich.). Levin, who briefed reporters Aug. 20 by telephone from Tel Aviv, Israel, said he could not recall details but said that he believes problems revolve mostly around production capability and may include paperwork issues as well. Levin further said Defense Secretary Robert Gates has tasked Deputy Defense Secretary Gordon England to clear up the matter.

Neelam Mathews
Even as the Indian government moves ahead with implementing its new agreement on U.S.-India civil nuclear cooperation, India's Left party continues its face-off on the deal and is threatening a pullout that could bring the ruling government down.

Staff
Boeing officials say their Laser Avenger, a humvee-mounted air defense system they plan to test with a 1-kilowatt laser, will require "single-digit minutes" to destroy improvised explosive devices or unexploded ordnance. An article in the Aug. 17 DAILY said the operator could destroy a target after up to 40 minutes of lasing.

Craig Covault
The STS-118 crew and Mission Control checked out Endeavour's new three-string Global Positioning System (GPS) navigation suite Aug. 20 in preparation for Endeavour's planned reentry and landing at Kennedy Space Center (KSC) Aug. 21. Endeavour, making its first reentry since December 2002, is the first vehicle in the orbiter fleet to have its old Tactical Air Navigation (TACAN) receivers replaced by GPS.

Staff
ARMY Litton Systems Inc., Garland, Texas, was awarded on July 24, 2007, a delivery order amount of $6,670,758 as part of a $38,307,642 firm-fixed-price contract for sniper night sights. Work will be performed in Garland, Texas, and is expected to be completed by July 23, 2012. Contract funds will not expire at the end of the current fiscal year. This was a sole source contract initiated on Aug. 7, 2006. The U.S. Army Research, Development, and Engineering Command, Aberdeen Proving Ground, Md., is the contracting activity (W91CRB-07-D-0020).

Staff
NORTHROP-EADS TANKER: Northrop Grumman and EADS' A310 demonstrator aircraft is now ready for its next phase of Aerial Refueling Boom System (ARBS) flight tests, which will involve in-flight contacts and airborne fuel transfers with a variety of receiver aircraft, Northrop said Aug. 20. The company said its proposed KC-30 tanker's fly-by-wire boom has completed more than 130 hours of evaluations during 50 flights. The tanker is designed with a centerline-mounted ARBS and hose and drogue unit, along with two underwing hose and drogue refueling pods.

Staff
NAVY C4I: The U.S. Navy is awarding Science Applications International Corp. a potentially five-year, $473 million contract for Navy C4I programs, the company said Aug. 16. Specifically, the award funds In-Service Engineering Agent (ISEA) and Networks Integration Engineering Facility (NIEF) support.

Staff
SOLAR ARRAYS: Over the next several months, Boeing will work with business partner Hughes to complete on-orbit testing and deployment of the Spaceway 3 satellite's 132-foot solar arrays, as well as satellite check-out and system acceptance. Hughes will then place the satellite into commercial operation. Spaceway 3 achieved orbit after a successful launch from Kourou, French Guiana on an Ariane 5 Aug 15.

Staff
MERGING MISSILES: The U.S. ballistic missile defense (BMD) system will be renamed the ballistic and cruise missile defense system within one year, predicts Dave Kier, Lockheed Martin missile defense vice president. Some lawmakers are pushing the Pentagon to centralize efforts, currently spread among the services and Defense Dept. organizations, to counter cruise missiles. To date, the Pentagon has rejected a merger with BMD, citing a need for the Missile Defense Agency to focus solely on the need to refine antiballistic missile technologies.

Frank Morring Jr
NASA engineers have turned their attention to the latest foam "liberation" problem and its impact on future space shuttle launches, now that they have cleared Endeavour to land without repairs to the foam-induced gouge in its thermal protection system. Loss of external-tank insulating foam from a steel oxygen-feedline bracket has been declared an "in flight anomaly," meaning engineers must find a way to fix it or develop a sound rationale that it is safe to fly without a fix before another shuttle can be launched.

Staff
NEW STAND: A groundbreaking ceremony will be held Aug. 23 for the first large rocket test stand to be built at NASA's Stennis Space Center since the 1960s. The 300-foot-tall, open steel frame A-3 Test Stand will allow for simulated altitude testing on the Pratt & Whitney Rocketdyne J-2X engine, which is an upgrade of the Saturn V upper stage engines, over burn times as long as 550 seconds. The J-2X will power the upper stage of the Ares I crew launch vehicle and the Earth departure stage of the Ares V cargo launch vehicle.

Staff
CSAR-X RESCUE: Rep. Maurice Hinchey (D-N.Y.) sent a letter Aug. 16 to the Government Accountability Office (GAO) offering his "full support" for GAO's ongoing review of the U.S. Air Force Combat Search and Rescue (CSAR-X) helicopter program. The letter comes on the heels of a recently revealed e-mail in which Air Force Secretary Michael Wynne (see page 3) expressed a desire to remain with the original CSAR-X selection: Boeing's HH-47 Chinook.

Bettina H Chavanne, Michael Fabey
The U.S. Air Force is expecting the Government Accountability Office (GAO) to weigh in by the end of August on the second round of protests against the service's decision to award a contract to Boeing to build more than 140 combat, search and rescue (CSAR-X) helicopters for between $10 billion and $15 billion, industry sources say.

Staff
NOT TO WORRY: U.S. Army Lt. Gen. (Ret.) Ed Anderson, a principal at the Booz Allen Hamilton consulting firm, says space-based missile defense is "a trend for the future" despite political concerns over potentially starting a space weapons race. Such systems would be useful for space control and anti-satellite capabilities, Anderson argues. Russia has asked the United States to agree not to engage in space-based weapons efforts as a precondition to negotiations seeking Moscow's support for U.S.

Staff
HEL TD: The U.S. Army on Aug. 17 awarded Northrop Grumman $8 million to develop the High Energy Laser Technology Demonstrator (HEL TD) - a truck-mounted laser weapon for countering rockets, artillery shells and mortar rounds. Under the contract, the company will develop and complete a preliminary design of a rugged beam control system on a Heavy Expanded Mobility Tactical Truck (HEMTT). The effort could reach $50 million if all contract options are exercised.

Staff
To list an event, send information in calendar format to Donna Thomas at [email protected] July 30 - Aug. 2 -- 2007 Naval S&T Partnership Conference, "The Navy After Next... Powered by Naval Research II -- Power & Energy for the Fleet and Force," Marriott Wardman Park, Washington, D.C. For more information go to www.ndia.org/meetings/7200. Aug. 6 - 9 -- AUVSI's Unmmaned Systems North America 2007, Washington Convention Center, Washington, D.C. For more information go to www.auvsi.org.

Staff
SMALL FUROR: The House Small Business Committee says the Bush administration continues to fall short of a 23 percent government-wide small business prime contracting goal by 4 percent. The charge, which the Democratic-run panel calculated itself but based on Small Business Administration figures, comes as large contractors and government officials increasingly feel pressured after years of small business contracting angst.