Mission managers have cleared the space shuttle Endeavour to return to Earth as early as March 26, ratifying engineering findings that the orbiter’s thermal protection system is in good shape to withstand the heat of reentry. Leroy Cain, chairman of the STS-123/1J/A mission management team (MMT), said March 24 that the orbiter systems were ready for the return. A slow pressure leak in one of the three redundant auxiliary power units that will drive orbiter hydraulics during reentry is not a concern, and controllers plan to use the system, he said.
CSAR-X AND TANKER: Another wrinkle in the Pentagon Inspector General’s investigation into the U.S. Air Force’s Combat Search and Rescue replacement (CSAR-X) helicopter program is the recent $35 billion tanker award to the team of Northrop Grumman and EADS, which has been protested by Boeing. Boeing won the original CSAR-X award, which losing bidders Lockheed Martin and Sikorsky have protested twice.
The Office of Naval Research’s (ONR) Advanced Electric Ship Demonstrator, the Sea Jet, has had its stern modified with a unique Rimjet propulsion system manufactured by General Dynamics Electric Boat.
The Defense Advanced Research Projects Agency (DARPA) is looking to develop an advanced, guided, actively controlled 50-caliber sniper rifle system whose range, accuracy and target speed are classified. DARPA released a Broad Agency Announcement (BAA) March 21 requesting “innovative solutions that will expand the knowledge base and design capabilities” for the EXtreme ACcuracy Tasked Ordnance (EXACTO) program. The technology development and demonstration program to create the gun will be conducted in three phases. Initial proposals are due May 5.
WEBB SUNSHIELD: The tennis court-sized sunshield that Northrop Grumman has developed to protect NASA’s James Webb Space Telescope has completed its preliminary design review (PDR). The sunshield is a five-layer structure composed of extremely thin, specially coated reflective membranes and a support structure that is critical to keeping solar heat from cooking the telescope’s science package, which includes instruments operating at cryogenic temperatures.
GWAC SURGE: Federal spending on task order contract vehicles, such as General Services Administration (GSA)-managed governmentwide acquisition contracts (GWACs) and agency-managed task order vehicles, increased by 39 percent over 2006, according to consultancy Input’s analysis of fiscal 2007 federal procurement spending data. But the majority of the increase came from non-GSA vehicles and stemmed from defense umbrella contracts.
PARIS - Elbit Systems has won an important competition in France to supply the Skylark 1 unmanned aerial vehicle (UAV) to the French special operations forces. The hotly contested competition, in which ten firms were vying for the award, also represents a big breakthrough for Elbit since it’s the company’s first UAV win in France. Rival Israel Aerospace Industries already has been supplying the SIDM tactical unmanned aircraft.
Leaders of both political parties from the House and Senate Armed Services committees have unveiled an unofficial panel of experts to study U.S. nuclear weapon forces and posture, called the Congressional Commission on United States Strategic Posture.
SWISS LICENSE: WorldSpace can operate hybrid space/land-based digital audio radio services (DARS) in Switzerland under a new license from the Swiss government. The company already has a license in Italy and expects to add four more this year for the DARS service, to be introduced next year using its Afristar satellite. WorldSpace reported a net loss of $169.5 million in 2007, up from a loss of $128.6 million the year before.
GPS FUTURES: NASA will host a meeting of the National Space-Based Position, Navigation, and Timing (PNT) Advisory Board on March 27-28 in Washington. According to a notice in the Federal Register, the public meting will include updates on the implementation of the Bush administration’s 2004 space-based PNT policy, Global Positioning System (GPS) modernization plans, how the U.S.
To list an event, send information in calendar format to Donna Thomas at [email protected]. (Bold type indicated new calendar listing.) March 31 - April 1 — Maritime Security & Domain Awareness, “An Outstanding Conference on the Latest Missions, Plans and Prospects,” Doubletree Hotel Crystal City-National Airport, Washington, D.C. For more information go to www.technologytraining.com
FAST FORWARD: The U.S. Army’s plan to fast-track elements of its Future Combat Systems (FCS) program will require extensive planning because there are “huge tradeoffs ahead,” one Army official says. The Army will receive $20 billion to move ahead with its plans, but where the money will come from has yet to be decided. A small group has been commissioned to do research analysis and “come up with the right answer,” according to the official.
SCRAMJET READY: Pratt & Whitney Rocketdyne is preparing for tests of the newly assembled flight clearance engine SJX61-2 that is destined to power Boeing’s X-51A hypersonic WaveRider demonstrator in 2009. The SJX61-2, also known as the X-2, is a hydrocarbon-fueled scramjet engine designed to power the X-51A to speeds between Mach 4.5 and Mach 6 plus. Four test firings will be attempted in 2009, with each vehicle being dropped from a B-52 mothership before being boosted by a rocket to scramjet operating conditions.
The U.S. Navy must work closely with industry to position shipbuilding to weather future challenges, Navy Secretary Donald Winter said March 20. Winter told a luncheon crowd at the Navy Sea-Air-Space Expo in Washington that there is no “silver bullet, no single point solution, no single change that will solve the efficiency and modernization challenges in the shipbuilding industry.”
GRIM READING: A draft of the British Defense Ministry’s Planning Round 08 may now be on the U.K. Secretary of State for Defense’s desk – following a supposed bust-up between the army and navy over proposed cuts and delays. Speculation is rife as to which programs will be hit, to what extent, when the government will make public its decisions, and when the Defense Ministry will embark on the next planning round – also liable to be ugly. Most expect the government to announce the outcome of PR08 just before the British Parliament ends business for its summer break, July 22.
RETURNING SEASPRITE: Prime contractor Kaman will take back the SH-2G(A) Super Seasprite aircraft, training equipment and spares from the Australian government under an agreement that formally ends the program. Australia will get half of the proceeds, or a minimum of A$39.5 million ($35.5 million), from Kaman’s resale of the equipment. Out of the A$1.3 billion spent on the abandoned project, the government will also retain A$30 million of spares that can be used for its Sikorsky H-60s.
Under a Defense Department Inspector General (IG) investigation and more intense source selection scrutiny, the Air Force’s $15 billion combat, search and rescue replacement helicopter (CSAR-X) program is further delaying its planned contract award. The IG announced its investigation about a month ago into the way the Air Force changed a key performance parameter (KPP) for deployability (Aerospace DAILY, Feb. 25).
STENNIS FIRE: Test engineers at Stennis Space Center shut down a planned 550-second powerpack test of the J-2X rocket engine after 72 seconds March 19 when they noticed a fire on one of the valves on the facility side of the setup. The test article and the test stand both escaped damage, and testing is expected to proceed this week, NASA said.