Adrian is Auckland bureau chief for Aviation Week, based in New Zealand. He covers commercial aviation in the Asia-Pacific region.
Adrian was previously based in Aviation Week’s Washington office for nine years, writing for a range of the group’s publications and covering many aspects of the commercial aviation industry. He has won Australasian and international awards for his aviation writing.
Prior to joining Aviation Week in 2002, Adrian covered aviation industry and policy issues for two other publishing companies in Washington. He has also worked for newspapers in Texas and New Zealand, covering a wide range of topics. Adrian graduated from Auckland University with a degree in history and English in 1992.
Airbus last week said it has begun fatigue testing on the A380 airframe, more than two months ahead of schedule. The tests are being performed by IABG in a purpose-built hangar in Dresden. The test loads will be put on the airframe using 184 computer-controlled hydraulic jacks, and a 1,800-tonne test rig has been constructed. The cabin can be pressurized during the tests, Airbus says. Data will show how the aircraft will respond to stress during different stages of operation such as landing, take-off, taxiing and cruising.
The on-time performance for U.S. carriers dropped five points to 70.9% in July, the U.S. Transportation Dept. said last week. The on-time rate was also 4.3 points worse than the June rate of 75.2%. DOT says just over 8% of all flights were delayed by weather, compared with 6.55% last year. The cancellation rate for July was 2.2%, up from 1.6% last year. The DOT statistics are for 20 reporting carriers.
Both runways at New Orleans International Airport yesterday were restored to 24-hour availability for hurricane relief flights, as FAA scrambles to repair air traffic control facilities at this and other airports hit by Katrina. FAA said New Orleans could handle nine landings per hour, but only in visual flight rule (VFR) conditions. Yesterday morning the airport had adequate ramp space for nine aircraft, but this capacity was expected to increase to 12 by the end of the day. Firefighting and rescue equipment was also reported functional.